VYKIN 90-IC Impact Crusher

Our focus is to help our customers grow their businesses by providing the best in quality equipment, service and after-sales support.

Quick Start Guide

Download your quick start guide here (to use with the section below):

 

Outlining the preliminary essential steps for setup and initial operation:

Please review and follow all safety and maintenance procedures outlined in the user’s manual prior to operating any VYKIN machinery.

Prior to crushing any material:

1. Unloading:

1a. Please see next section below for instructions on how to safely unload your machine.

2. Fuel & Lubrication:

All tanks come bone dry, please ensure all tanks are filled appropriately:

2a. hydraulic oil tank (>90-100%);
2b. diesel fuel tank;
2c. engine coolant tank;
2d. grease all lubrication points (Refer to the maintenance section below for specific locations and manual for grease type.)

3. Material Inspection:

3a. Please check the type of material and make sure it is a non-hazardous waste material.
3b. Ensure the material’s feed size is compatible with the crusher’s feed opening and selected gap setting (and screen mesh).
3c.
Ensure material is (relatively) dry material — the 90-IC can handle a variety of materials, but wet / sticky material can reduce efficiency.

4. Initial Operation:

4a. Position the crusher on a stable, level surface.
4b. Start the crusher and let it run idle for a few minutes to warm up.
4c. Begin with a slow and steady feed rate, gradually increasing it while monitoring the crusher’s performance.
4d. Pay attention to any unusual noises or vibrations, and stop the machine immediately if any problems occur.
4e. Check all belts, guards, and safety features are in place and functioning correctly.

5. Initial Break-In Period & Maintenance:

5a. During the first week of operation, check all bolts, lock nuts, pins, fittings, fasteners and connections every 3-4 hours. Then check and tighten all bolts and fasteners periodically, thereafter.
5b. Please refer to the maintenance schedule found both on the machine and the operation’s manual (manual contains specific instructions).
5c. Conduct frequent inspections of the blow bars and apron settings for wear and tear — and regularly clean screen decks to prevent material buildup ensuring efficient separation (replace damaged screens promptly to maintain product quality and prevent downtime). Adjust the apron gaps as needed to maintain consistent product quality and prevent downtime.

6. Feed Rate and Material Flow:

6a. Start with a slow and steady feed rate, gradually increasing it while monitoring the crusher’s performance and material flow.
6b. Avoid overloading the crusher, as this can lead to inefficiencies and potential damage.
6c. Monitor the feed material and remove any uncrushable materials, such as steel or large metal objects, to prevent damage to the crushing chamber.

Important Notes:

  • The VYKIN 90-IC is a powerful and versatile crusher. By following these simple steps and referring to the user’s manual, you can ensure safe and productive operation.
  • Pay close attention to the maximum feed size for your crusher model to avoid overloading and damage.
  • Always wear appropriate safety gear, including eye and ear protection, when operating the machine.
    .

If you have any questions or concerns, don’t hesitate to contact VYKIN customer support for assistance.

How to Unload

Wireless remote is found in the control panel.

Please be advised your crusher will be delivered on a RGN or a flat rack / bed (see photo below for reference).  To unload your machine from the truck — you can (1) track it out by remote:

  • (1) you can move your machine using the wireless remote, however it may still require either a portable loading ramp, or a loading dock (building a quick makeshift unloading platform also works). Loading clearance from ground to bottom of truck is about 4′ to 4.5′ typically. 
  • or, (2) you can use a forklift to unload your accessories. Either an 8 or 10 ton forklift, or a skid steer with forklift attachment with appropriate weight lifting capacity would work.
 

The extra accessories and crate of additional wear parts will be placed on top of the machine, in hopper / separate pallet.

1b9d0443 dda4 474e 8034 d0020b4ed418 VYKIN 90-IC Impactor

How to Startup, Drive, and More

Video Timestamps:

00:11 to 02:13  Startup, pairing remote, and driving the machine (for reference, to drive the crusher forward — push both left and right levers forward on the remote controller)
02:14 to 03:18  Starting the crusher and screener
03:19  General maintenance schedule

Page 57 in manual for filling hydraulic oil tank. After 50-hours, filter the hydraulic oil for any metal filings during break-in period.

Service and Maintenance Points

Please refer to the maintenance schedule found both on the machine and on page 39-40 in your user’s manual (manual contains specific instructions).

10 Grease Points:

  • 2 on screen deck (1 on each side)
  • 4 on mids conveyor (2 on top roller and 2 at bottom roller)
  • 4 on fines conveyor (2 on top roller and 2 at bottom roller)

Troubleshooting:

  • Battery is dead and need to jump-start my machine.
    • When shutting down your machine, make sure the main power supply switch is turned off (under control panel; pull switch up to turn off power); turn off engine ignition key on control panel and remove keys. 

Engine Maintenance:

(See Diesel Engine manual attached on engine for its maintenance schedule)

  • 25HP 18.5kW Kubota (D1703-M-DI-E4) Diesel Engine Instruction Manual

Check the flywheel belt tension monthly. You should be able to push down on the belts just enough to get an inch or so of flex on single banded belt units (or fit a finger or two through the gap on units with individual belts).

NEVER run the jaws if you hear them hitting each other or any other metal-on-metal clanking. Severe damage to the machine can occur.

Before the start of each shift, you need to do the prepatory work before starting. This should primarily be focused on re-tightening any bolts, nuts, and other connections — and lubricating all grease points.

8.0 Maintenance Schedule

* 8.1 Be sure to grease the jaw bearings and housing daily before operation.
* 8.1 Be sure to grease the jaw bearings, jaw housing, and all other daily before operation.
* 8.2 Check for loosened bolts on frame and jaw brackets weekly.
* 8.3 Check rubber skirting integrity around conveyor weekly.
* 8.4 Check wheel lug nuts for tightness weekly.
* 8.5 Check fly wheel belt tension monthly. You should be able to push down on the belts just enough to fit a finger or two through the gap on units with individual belts, an inch or so of flex on single banded belt units.
* 8.6 Check the conveyor belt tension monthly. The belt should not be slipping while running under load.
* 8.7 Check the gear oil in the conveyor belt drive roller every 6 months. Rotate port to 9 or 3 o’clock and fill to that level.
* 8.8 Check the grease port on the jaw motor every six months. 10-15 pumps of grease should be sufficient.
* 8.9 Check the vibration motor foundation integrity every six months and be sure the bolts are tight.

9.0 Attachments

(See Diesel Engine manual attached on engine for its maintenance schedule)

9.1 121HP 90kW Cummins (F3.8 121) Diesel Engine Instruction Manual